The building consists of 3 floors of luxurious and bright offices. Each floor consists of an office which is 83 sqm (internal) plus 9 sqm covered verandas.
It has direct access to the High Way, just less than a minute drive from the round about of Germasogeia and a 3 minute drive by from the sea.
It is under construction and it is estimated that the completion of the project will be around the end of September 2024.
The tenant has the possibility, if interested, to do the internal configuration as he wants with partitions.
There is the possibility for 9 parking spaces and for turning one WC as shown in the plans into two WCs in each office.
Each apartment will have a raised floor, kitchen, server room, and high security systems at the entrance.
The staircase will be granite and the entrance and elevator will be covered with marble and HPL.
Photovoltaic panels will also be installed upon completion